CRITERIA FOR FINANCIAL ACCEPTABILITY OF AN INVESTMENT PROJECT

Keywords: criteria of financial efficiency of the project, levels of profitability of the investment project, analysis of financial acceptability of the project, risk of unacceptable project profitability, methods of scenarios and Monte Carlo

Abstract

The article is devoted to the development of new approaches and methods for quantitative assessment of the financial results of investment projects under conditions of uncertainty. The authors suggest that when checking the expected results of an investment project using the main discounted indicators of financial efficiency, instead of the traditional break-even analysis of the project, check its financial acceptability, that is, compliance of the project’s profitability to the minimum of investor requirements. For this, the values of discounted indicators of financial efficiency of the investment project NPV (Net Present Value) and PI (Profitability Index) should be compared not with break-even values, but with the lower limit of profitability acceptable to the investor. Instead of two other main indicators of the financial efficiency of the project – IRR (Internal Rate of Return) and DPP (Discounted Payback Period) – the authors propose to use new, more general indicators of financial project’s acceptability – IRAR (Internal Rate of Acceptable Return) and DPAR (Discounted Period of Acceptable Return). For the break-even level of project’s profitability, the values of the new and traditional indicators are the same, that is: IRAR = IRR, DPAR = DPP. Since the criteria for financial project`s acceptability are formulated for a situation of uncertainty, then the mathematical expectations of the values of the corresponding indicators are considered. The application of the proposed criteria for the financial acceptability of the project is illustrated with a specific example.As an example, an investment project with a rental flow of payments and three scenarios of possible development is considered. For this project, an analysis of its financial acceptability when setting different levels of project’s profitability. In a situation of partial uncertainty, decisions on the implementation of a any investment project are made taking into account two factors: the profitability of the project and its risk. Therefore, in addition to indicators of the financial acceptability of the project, the article also considered indicators of the risk of unacceptably low profitability of the project. For the example under consideration, the values of these risk indicators were obtained using the scenario method and the Monte Carlo method.

References


1. Keršytė A. (2012) Investment risk analysis: theoretical aspects. Economics and Management, no. 17, (3), pp. 889–894. DOI: https://doi.org/10.5755/j01.em.17.3.2099
2. Hopkinson M. (2017) Net Present Value and Risk Modelling for Projects. New York: Routledge, 180 p. DOI: https://doi.org/10.4324/9781315248172
3. Gotze U., Northcott D., Schuster P. (2015) Investment Appraisal: Methods and Models. (2 ed.). Berlin Heidelberg: Springer-Verlag, 363 p. DOI: https://doi.org/10.1007/978-3-662-45851-8
4. Carmichael D.G. (2017) Adjustments within discount rates to cater for uncertainty – Guidelines. The Engineering Economist, no. 62, (4), pp. 322–335. DOI: https://doi.org/10.1080/0013791X.2016.1245376
5. Tarzia D.A. (2016) Properties of the Financial Break-Even Point in a Simple Investment Project as a Function of the Discount Rate. Journal of Economic & Financial Studies, no. 4, (2), pp. 31–45. DOI: https://doi.org/10.18533/jefs.v4i02.226
6. Hazen G., Magni C.A. (2021) Average internal rate of return for risky projects. The Engineering Economist, no. 66, (2), pp. 90–120. DOI: https://doi.org/10.1080/0013791X.2021.1894284
7. Brzaković T., Brzaković A., Petrović J. (2016) Application of scenario analysis in the investment projects evaluation. Ekonomika poljoprivrede, no. 63(2), pp. 501–513. DOI: https://doi.org/10.5937/ekoPolj1602501B
8. Vasil’ev A., Vasil’eva N., Tupko N. (2017) Development of combined method for analysis of financial risks of investment project. Technology Audit and Production Reserves, no. 4(4), pp. 43–49. DOI: https://doi.org/10.15587/2312-8372.2017.108527
9. Vasiliev A., Vasilieva N., Tupko N. (2022) Development of a systems approach to assessment investment project risks: risks of unacceptably low project profitability. Eastern-European journal of enterprise technologie, no. 1, (4), pp. 77–86. DOI: https://doi.org/10.15587/1729-4061.2022.252997
Published
2024-03-29
Pages
60-66
Section
SECTION 3 MATHEMATICAL METHODS, MODELS AND INFORMATION TECHNOLOGIES IN ECONOMY